
Build what you voted for.
Pool deck, garage and façade move from approvals to construction; the porte-cochère gets fixed; the new fire-alarm panel protects every floor. Nothing matters more than finishing and life safety.
Steady hands. Proven results. Keep the momentum.
Maintenance down 4% this year, with a 8.5% cut projected for 2027. Reserves up 9× — from $1.4M to $12.4M. $500K saved on insurance. The pool deck approved by your vote. Halfway through the job is the wrong time to hand it to someone new.
Full-time resident. Father of two. Real estate and finance is my profession — 17 years of it, ten at Ernst & Young, today Senior Vice President of real-estate investments at GIC. Four years on your board, two as Treasurer. I know Florida Statute 718, every contract we hold, and this building room by room. What I offer isn't promises — it's a record you can read.
One of your seven votes finishes it.
My top five for 2027. Each one specific, each one measurable, each one already under way — and the record below shows how I deliver.

Pool deck, garage and façade move from approvals to construction; the porte-cochère gets fixed; the new fire-alarm panel protects every floor. Nothing matters more than finishing and life safety.
Run $200K ahead of budget in 2027, cut maintenance another 3% for 2028, and keep the reserves growing while the projects draw on them.
Every elevator overhauled and independently inspected; the remaining PRVs and aging drain lines replaced before they fail, not after.
Today's rules are outdated and inconsistently applied, and the condo documents contradict current Florida law. Rewrite both — clear, current, and the same for every owner.
Lobby and hallways to bid and to an owners' vote; security separated from the front desk so the desk serves residents; uniforms in every department, a sharper online presence and a fuller social calendar.
Not one good year — the same judgment, 2023 to today.
Four things are mid-flight. Here is what each one looks like with a steady hand — and what a restart actually costs you.
Approved 77–67. $9.1M of reserves applicable. Contractor chosen. Shovels in 2027.
A new board spends months re-reading three years of reports before it can sign anything. The 2027 bids expire, the deck is re-bid, and the owners' share goes up.
Engineers, contractor and scope already chosen. Deadline set by Florida law — and on schedule.
Engineers and contractor re-selected from scratch. Florida's deadline does not move — so the building rushes, and rushing costs more.
Down 4% this year, 8.5% projected next — budget tight, bid everything, bank the surplus.
A new team builds its first budget on your clock. The discipline behind two cuts in a row goes first, and the 2027 projection goes with it.
Castle Group, three years in — an award-winning team. Stephanie: Castle's Assistant Property Manager of the Year, 2025. Olga, our General Manager: Aventura's 2026 General Manager of the Year, per Condo Connect.
We did it once, in 2023 — I helped lead it — and it cost most of a year to get back to speed. Do it mid-deck, mid-recertification, mid-fire-panel and all three stall while a new company learns the building from zero. You would be firing an award-winning team to start over.
Fix what's broken. Don't restart the plane.
A little perspective before you vote. None of this is one person's work — it's the whole 2026 board, every director, with Castle's management team and the building staff, in rooms you never enter. Here it is, unedited. Tap any photo.
Straight answers to what owners ask me most. Didn't find yours? Leave it below.
Because this is what I do. Seventeen years in real estate and finance, four years on this board, two as Treasurer, and the pool deck carried from the first engineering report to your vote. I live here full time, I read every page, and I know Florida Statute 718 and this building room by room. No learning on the job.
Three questions, every time. Was it bid competitively? Is the scope in writing? Can the reserves carry it without touching your fee? Yes to all three and I vote yes. Otherwise I vote no — and I have, 16 times, on the record. The same rule applies to everyone, including people I like.
Reserves from $1.4M to $12.4M, with the 2024 budget that funded them properly moved by me. $519K of surplus as Treasurer and $500K more as a director. A management company replaced. The pool deck approved by owners, 77–67. The $1.02M fire panel. Insurance down $500K a year. And the building's website, the Reimagine site and the building's logo, built by hand.
Budget tight. Bid everything. Put the scope in writing before the vote. Bank the surplus instead of spending it. Show up — 95% of meetings in four years — and read the packet before you walk in. It isn't clever. It's consistent, and it's why the numbers moved.
Five things: build what you voted for — deck, garage, façade, fire panel; keep the money tight — $200K ahead of budget, another 3% off for 2028; fix the elevators and finish the plumbing; one rulebook and modern condo documents, applied to everyone; and a lobby, a front desk and a social calendar you're proud of. The list is above, with the numbers.
The agenda on the things I own: finance and major projects. One seat held by someone who does this for a living is the difference between a budget that funds the reserves and one that hopes for the best. The record above is what one seat did.
Online through ONR, or on the paper ballot in your meeting notice. You may vote for up to seven; I'm asking for one of them. Annual meeting: December 10, 2026 at 6:00 PM.
I'll answer you directly, and add the questions many owners share to the list above.
Steady hands. Proven results. Finish the job.